C- MTV+ME
| List of steps for completing criterion D | Scheduled date and time that each step will take | Any materials you’ll need, including sources | Resources (where you’ll get the materials and sources) | Record any changes to these steps (what they were and why) |
| 1)Finish criterion C- Plan
2)Play around Macromedia Flash program. |
May 23rd 2008,
*the first step might take all the first period, and the second step will take about the other half of class.
|
Calendar, IT lab, macromedia Flash software | They are all in the IT lab, with a calendar behind Ms. Wilson |
I followed this step. I was able to finish my plan quicker than I thought and I spent my next hours playing (investigating) the program. |
| 1)During class, draw and complete everything for page 1. | May 27th 2008,
*this section will take a lot of time. I don’t want to rush anything- especially if I want to make everything work out perfectly! |
Macromedia flash, storyboard | They are all in the IT lab once again. The storyboard was already drawn- and I can get them back from Ms. Wilson | I followed this step as well. I also worked a little more because I had time by working on my second page. |
| 1) During class, draw and complete everything for page 2.
2) if time, check what you have so far, and make sure everything is working fine. |
May 29th 2008,
*this section will take a lot of time as well. I am pretty sure that page two will be a little easier since there isn’t any hard movements to include. |
Macromedia flash and my storyboard | Same as above | I finished the project! I followed everything as written. |
| Finish up page 3 and 4 from my storyboard | June 4th, June 6th 2008
*this section will be a little longer than any other classes. I will need probably 4 classes in order to work on it. |
Same as above | Same as above | Because I had finished all my work earlier, I added a song into the file. Done! |
| 1)Go back to my work, make sure I followed all the technical specifications for the MTV+Me requirements.
2)Save it under a file that Ms. Wilson wants you to 3)Add the last section of the plan: recording any changes 4)post it on the blog! |
June 10th 2008
*all the work will be done by this day, and all I will have to do is just wrap them all up. Not all of them will take long. Probably working for two class period of time will be perfect! |
Internet (blog), document (technical specification) | Once again, all are in the IT lab. I will just need to be seated and be focused on my work during class. | I couldn’t work as planned, because it is the exam week.
I will just have to finish the whole project on June 11th, the day we have our IT exam. |
| 1) add all the changes in Plan
2) learn how to upload criterion D- MID 3) upload the MID 4) write evaluation 5) post it on the blog |
June 11th 2008
*EXAM: finish everything. Time is 1 hour. |
Internet, documents, movie maker, flash | Same as above | I worked on my project! I’m done! I’m finally finished! I followed all the steps from number 1 to 5! I’m done! Hooooray! |